Deliverables

No. Title        
Due date
Status
D 1.1 System specification, design and concept choices and evaluations of variants T0+6 not public
D 1.2 Propeller design and performance T0+9 not public
D 1.3 Breadboard(s) for flight concept validation T0+12 not public
D 1.4 Design of first prototype T0+12 not public
D 1.5 Simulation model of overall system T0+12 not public
D 1.6
First prototype ready
T0+18
not public
D 1.7
Design of final system
T0+24
not public
D 1.8
Delivery of final system
T0+32
not public
D 2.1 Report on control, navigation concept and improved system specification T0+6 not public
D 2.2 Delivery of control simulation tools T0+12 not public
D 2.3 First implementation of navigation algorithms on wheeled micro-robot T0+12 not public
D 2.4
Delivery of novel SLAM algorithm for low processing power
T0+18
not public
D 2.5
Preliminary control algorithms
T0+18
not public
D 2.6
Final control and navigation algorithms
T0+30
not public
D 3.1 Specification of power and energy demand of the system T0+6 not public
D 3.2
Application integrated Li-Polymer battery including energy management
T0+18
not public
D 3.3
Delivery of five watts micro fuel cell final design
T0+18
not public
D 3.4
Delivery of hydrogen micro generator final design
T0+30
not public
D 4.1 Specification of imager, optics and camera sub-system T0+6 not public
D 4.2 Design of imager chip T0+12 not public
D 4.3
Design of optical sub-system
T0+13
not public
D 4.4
Design of camera electronics
T0+14
not public
D 4.5
uIMU Prototype 1
T0+15
not public
D 4.6
First camera prototypes
T0+18
not public
D 4.7
Final design of imager, optics and camera electronics
T0+22
not public
D 4.8
Final camera sub-system delivery
T0+27
not public
D 4.9
uIMU Prototype 2
T0+30
not public
D 5.1 Report on concept, selection and specification of micro-actuation T0+6 not public
D 5.2 Report on the test plan & test-bench of the micro actuators T0+12 not public
D 5.3 Report on expected performance & interface definition of the micro actuators T0+12 not public
D 5.4 Delivery of first prototypes of actuators
T0+16
not public
D 5.5 Test report and improvement
T0+18
not public
D 5.6 Delivery of final actuators
T0+30
not yet due
D 6.1 Report on Performance of Breadbord(s) Tests (Results Integration Week 1) T0+12 not public
D 6.2 Report on Performance of First Prototype (Results Integration Week 2)
T0+20
not public
D 6.3
Report on Performance of Final Prototype (Results Integration Week 3)
T0+36 -> T0+39
not yet due
D 7.1 Kick-off meeting T0+1 not public
D 7.2 Project Webpage up and running T0+3 pdf?
D 7.3 Internal seminar on “Micro flying robots design and optimization” T0+10 pdf
D 7.4
Workshop on “Micro flying robots”
T0+18
pdf
D 7.5 Workshop on “Miniaturized Fuel-cells” T0+24
pdf
D 7.6 Internal progress reports T0+n*6 not public
D 7.7 Progress reports + Dissem. and Use Plan + Review meetings T0+n*12 not public
D 7.8
Final reports including final Dissem. and Use Plan and exploitation plan
T0+36 -> T0+39 not yet due
D 7.9
Market study
T0+36 -> T0+39
not yet due